Skip to content
chamundimachine tool accessories

Capability

Parts that fit the first time — with the measurements to prove it

Shafts, bushes, sleeves and mandrels where a fit, a runout or a surface finish decides whether the assembly performs. We plan the route around those features instead of discovering them at final inspection.

  • Development pieces and repeat batches
  • Grinding planned into the route
  • Inspection report on agreed dimensions
Section A-AStepped shaft, turned and ground

Best for

Drawings where fits, finish and concentricity decide function

You send

Drawing with revision, material, quantity and delivery target

You get back

Finished components with the critical dimensions reported

How it starts

Drawing reviewed before quotation, questions raised early

The situation

The parts that stall projects

Critical components tend to be the ones with a demanding drawing and a small quantity — exactly the combination that large suppliers deprioritise and small ones decline.

  • 01Suppliers returning the drawing, or missing the tolerance on the features that matter
  • 02One part needing machining, hardening and grinding from three different vendors
  • 03Hand-fitting at assembly because the fit was never actually held
  • 04Inspection documentation required with every delivery
  • 05A development quantity nobody wants to schedule

What you get

What working with CMTA actually delivers

Turned and ground components manufactured to validated drawings, with documented inspection.

  • A route planned around the ground features

    Grinding allowances, datum choices and hardness sequence are decided before the first cut, not improvised after heat treatment.

  • The critical dimensions measured

    Bearing seats, press fits, running clearances, concentricity and sealing finishes are identified, inspected and reported.

  • One supplier for the whole route

    Heat treatment, plating and coating are coordinated through approved partners with CMTA responsible for the finished part.

  • A repeatable second batch

    The approved revision and process route are retained so batch ten matches batch one.

Where this stops

Material certificates are passed through from the supplier where you request them at order stage. CMTA does not issue its own material certification.

01

Component types and applications

Precision engineering components are core to CMTA's work, with particular strength in turned and ground parts.

  • Shafts, spindles and arbors
  • Bushes, sleeves and liners
  • Test mandrels and balancing mandrels
  • Centres, adaptors and locating elements
  • Special components for SPMs, fixtures and machine sub-assemblies
02

Materials and batch profiles

Carbon and alloy steels, case-hardening and through-hardening grades, stainless steels and non-ferrous materials are machined to the drawing specification. Development quantities, small batches and repeat production are all accepted, and the process route is planned for the quantity — so a single prototype and a repeat batch are each economical in their own way.

03

Which dimensions actually control function

Every drawing carries dimensions of very different importance. We identify the ones that decide whether the assembly performs — bearing seats, press fits, running clearances, concentricity between diameters, the finish on sealing or sliding surfaces — and those are the features that get planned for, measured and reported.

It is a short list on most drawings. Knowing which items are on it is most of the job.

04

Turning, milling, drilling and grinding route

Most components follow a route of CNC turning or VMC machining, heat treatment where specified, then finish grinding on the diameters and faces carrying tight tolerances. Planning it before the first part is cut is what keeps grinding allowances, datums and hardness sequence consistent from the first piece to the last.

05

Prototype, development and repeat production

A first-off is inspected against the drawing and, if you wish, trialled in the assembly before the balance quantity is released. Repeat orders are manufactured against the same approved revision and route.

06

Inspection, documentation and packing

Dimensional and visual inspection is carried out during and after manufacture. Inspection reports for the agreed critical dimensions accompany delivery where requested, and material certificates are passed through when asked for at order stage. Finished components are protected against corrosion and handling damage, and marked so your receipt inspection is straightforward.

How it runs

The route from enquiry to verified result

Each stage produces something you can check, and the drawing approval stage is yours to control.

  1. 01

    Drawing review

    Critical dimensions, fits and finish identified; ambiguities raised with you before quotation.

  2. 02

    Process planning

    Operations, allowances, treatment sequence and inspection points defined.

  3. 03

    Manufacture

    Turning and milling, coordinated heat treatment, then finish grinding.

  4. 04

    Inspection and dispatch

    Measured against the agreed list, protected against corrosion and handling damage.

Before you enquire

What to send, and where to look next

The inputs that make a useful review, plus the related pages worth reading first.

What we need for a feasibility review

  • Drawing with revision, or a sample if no drawing exists
  • Material specification and any certificate requirement
  • Quantity now and expected repeat quantity
  • Critical tolerances, fits and surface finish
  • Heat treatment, plating or coating requirements

Send what you have. The technical review identifies the rest.

FAQ

Frequently asked questions

The questions engineers and buyers ask before sending a drawing. If yours is not here, ask it directly — you will get an engineer's answer, not a brochure.

Still have a question?

Talk to Anita M.N, Managing Partner, or send the drawing and let the review answer it.

What information is needed to quote a precision component?

A drawing with its revision, the material specification, the quantity, the critical tolerances and finish, and any heat treatment or coating requirement. If only a sample exists, CMTA can develop the drawing through the reverse-engineering route first.

Will you make a single development piece?

Yes. Single pieces and small batches are routine, and the route is retained so a later repeat order is manufactured the same way.

Which processes are completed in-house?

Machining, grinding, assembly and inspection are CMTA's own work. Where precision component manufacturing needs heat treatment, plating or coating, those are coordinated through approved partners and CMTA stays responsible for the finished part. The exact split for your job is confirmed in writing at feasibility review, not left vague.

How are inspection and acceptance requirements agreed?

Before manufacture, we list the dimensions, fits, finish and functional checks that actually decide whether the part works. Those are what get measured, reported and, where relevant, trialled on your machine. Acceptance is judged against that written list rather than a general assurance.

Start a project

Send us your drawing, sample or problem statement

Share what you are trying to make or fix. Our engineering team reviews every enquiry and responds with the questions that matter, a feasibility view and next steps.

Prefer to talk?

Call or WhatsApp Anita M.N, Managing Partner.