What we need from you
- Part drawing or model with datums marked
- Operation, machine and cutting or welding conditions
- Loading method and cycle target
- The quality problem you want removed
- Photographs of the current setup
Solution
When quality depends on which operator is running the job, the process is not really under control. A properly designed fixture moves that skill into steel where it stays.
Best for
Repeat parts where setup skill currently decides quality
You send
Part drawing with datums, process details and the problem
You get back
An approved design, then a fixture trialled and handed over
How it starts
Concept and timeline given after the part study
The situation
Without proper workholding the process depends on operator skill, cycle times stretch, and quality varies between shifts in ways nobody can quite predict.
What you get
From datum study to a trialled fixture, designed around your part and process.
The fixture locates on surfaces that matter and does not build error into downstream operations.
Locating scheme, clamping and machine interface shown on drawing before anything is manufactured.
Run with your components, measured, adjusted, and only then handed over.
Design files retained for duplicates, part-revision changes and replacement wear elements.
Where this stops
CMTA delivers the mechanical fixture. Hydraulic power packs, pneumatics and control integration are named in the proposal and delivered with partners rather than quietly assumed.
Trial parts measured against the drawing and loading time measured against the target agreed at concept stage.
How it runs
Each stage produces something you can check, and the drawing approval stage is yours to control.
Part, process, datums and how the component is located downstream.
Locating, clamping and interface proposed and approved on drawing.
Elements machined and ground, hardened where wear demands, assembled and inspected.
Run with real parts, adjusted, handed over with drawings retained.
Before you enquire
The inputs that make a useful review, plus the related pages worth reading first.
If two or more apply, this is probably the right route for you.
FAQ
The questions engineers and buyers ask before sending a drawing. If yours is not here, ask it directly — you will get an engineer's answer, not a brochure.
Still have a question?
Talk to Anita M.N, Managing Partner, or send the drawing and let the review answer it.
It depends on complexity. A realistic timeline is given at concept stage, with design approval as the milestone you control.
Yes. Design files are retained, so duplicates and modifications are straightforward.
Yes, after assessing the existing fixture and the change required.
Where the process benefits, features are added to prevent wrong or reversed loading, and wearing elements are made replaceable.
Start a project
Share what you are trying to make or fix. Our engineering team reviews every enquiry and responds with the questions that matter, a feasibility view and next steps.