Skip to content
chamundimachine tool accessories

CMTA

Practical guides, written by the people who make the parts

Application guides, checklists and explainers for engineers and buyers — published with a named technical reviewer and a last-updated date as each one is completed.

  • Named technical reviewer
  • No gated downloads
  • Written for engineers
ReferenceGuides for engineers and buyers

Published guides

Written by the people who make the parts

Practical engineering guidance, not sales copy. Each guide answers one question an engineer or buyer actually asks before sending a drawing — including, where it applies, the answer that says do not buy anything.

Tool holders

4 guides

Precision components

4 guides

Fixtures

4 guides

Reverse engineering

5 guides
What can be recreated from a sampleGeometry recovers well from a sample, even a worn one, because worn surfaces can usually be reconstructed from the surfaces that did not wear. Material and heat treatment do not recover from measurement alone — they have to be tested or inferred from function, and the difference should be stated openly rather than assumed.Read the guide7 minRisks when the material is unknownA replacement part can match the original in every dimension and still fail within weeks if the material or its treatment is wrong. Unknown material is the single largest risk in reverse engineering, and the responsible handling is to test, to reason from duty, and to record the decision — never to quietly assume.Read the guide7 minThe obsolete-parts workflowWhen a part fails and the OEM no longer supplies it, the sequence that works is: stabilise the situation, secure the evidence, establish feasibility, approve a drawing, make and verify one, then decide whether to hold a spare. The most common mistake is skipping straight to manufacture and discovering the sample was the only reference.Read the guide7 minSample to approved drawingThe drawing is where reverse engineering becomes something you own and can reorder against. It should distinguish what was measured directly from what was reconstructed, state the material decision and its basis, and be reviewed by someone who knows the application before it is approved.Read the guide6 minKeeping an older machine productiveA machine losing OEM support has not become unusable — it has become your responsibility. The question is whether its mechanical condition justifies keeping it, and if so, which handful of parts represent the real risk. Usually it is a short list, and it can be dealt with before anything fails.Read the guide7 min

Productivity

5 guides
How to measure setup time honestlySetup time is the interval between the last good part of one job and the first good part of the next. Measuring from 'machine stops' to 'machine starts' flatters the number and hides the part that usually costs the most: everything that happens before the operator reaches the machine.Read the guide6 minTooling symptoms that reduce throughputTooling problems rarely announce themselves as tooling problems. They appear as chatter someone has learned to live with, tool life that varies for no clear reason, a cycle time that has crept up, or scrap nobody has traced. Each symptom points at a different cause, and reading them correctly avoids replacing the wrong thing.Read the guide7 minEstablishing a cycle-time baselineAn improvement is only as credible as the baseline it is measured against. A defensible baseline breaks the cycle into its elements, is measured across more than one run, and records the conditions — part, machine, operator, material — so a later comparison is like for like.Read the guide6 minRecovering from a production delayWhen a line is stopped for a part, the first hour matters more than the next day. Establish exactly what is needed and what would be acceptable as an interim, describe it in a form somebody can act on immediately, and be explicit about which requirements are genuine and which are preference.Read the guide6 minWhen redesigning a part beats remaking itA part that fails once is an incident. A part that fails repeatedly is a design or a duty problem, and remaking it identically guarantees the next failure. The decision is whether to change the part, change what surrounds it, or accept the replacement cycle as the cheapest option — which it sometimes genuinely is.Read the guide6 min

Special purpose machines

4 guides

Sourcing and supply

3 guides

FAQ

Frequently asked questions

The questions engineers and buyers ask before sending a drawing. If yours is not here, ask it directly — you will get an engineer's answer, not a brochure.

Still have a question?

Talk to Anita M.N, Managing Partner, or send the drawing and let the review answer it.

How do I choose the right tool holder?

Start from the machine interface, the tool and the operation; then reach and clearance; then rigidity and runout. Each product page lists the inputs for that family.

What should an RFQ drawing include?

Revision, material, critical tolerances and fits, surface finish, heat treatment or coating, quantity and any inspection requirement.

When is reverse engineering appropriate?

When no drawing exists or can be obtained, the sample allows functional surfaces to be measured or reconstructed, and the part is mechanical.

How can setup time be reduced?

Measure where the time actually goes, then remove steps with pre-set holders, quick-locating fixtures and combined tools — trialled and measured.

Start a project

Send us your drawing, sample or problem statement

Share what you are trying to make or fix. Our engineering team reviews every enquiry and responds with the questions that matter, a feasibility view and next steps.

Prefer to talk?

Call or WhatsApp Anita M.N, Managing Partner.