Why incomplete drawings cost you money
When a supplier cannot see which dimensions matter, they have two options: ask, which costs time, or assume, which costs money. A defensive assumption usually means tighter tolerances than you need, a more expensive material condition, or a contingency in the price.
The irony is that the most expensive drawings to quote are often the ones marked with tight tolerances everywhere, because nothing distinguishes the features that control function from the ones that do not.